City
Sivas/İmranlı
Başlama Tarihi
22 Ağustos 2020
Bitiş Tarihi
10 Ekim 2020
Status
Completed
1350 walnut plantations
Wi-Fi automated drip irrigation system design and installation
Construction of 3 ponds with a capacity of 20,000 tons
Uplift lines between ponds that automatically fill at 300 meters elevation difference